What a home charger costs, what installation costs, which size your car needs, and where to find chargers in your city.

Rs 95,000+7 kW wall box, most homes
Rs 18,000 – 50,000Typical installation
7–9 hoursFull charge on 7 kW

EV charger prices in Pakistan

Charger only, without installation. Prices checked November 2026 from Pakistani sellers and can change with the dollar rate.

Portable charger

3–3.5 kW
Rs 65,000 – 1,25,000
Connection
Normal 3-pin / 15 A socket
Full charge*
15–18 hours

Often comes free with the car. Good for overnight top-ups.

Most homes

Wall box 7 kW

7–7.4 kW
Rs 95,000 – 2,45,000
Connection
Single phase (normal house)
Full charge*
7–9 hours

Best choice for most homes. Full charge overnight.

Wall box 11 kW

11 kW
Rs 2,15,000 – 2,60,000
Connection
Three phase
Full charge*
5–6 hours

Only faster if your car accepts 11 kW AC.

Wall box 22 kW

22 kW
Rs 1,85,000 – 3,20,000
Connection
Three phase
Full charge*
3–6 hours

Most cars in Pakistan accept 7–11 kW AC, so 22 kW rarely helps at home.

DC fast charger

30–180 kW
Quote per project
Connection
Three phase, commercial
Full charge*
30–60 minutes

For petrol pumps, plazas, offices and fleets.

*For a 50–60 kWh car battery, 10% to 100%. Sources: CNC Electric Pakistan – EV charger price guide · Acom.pk – EV chargers · GoEVCharger – installation cost in Pakistan

What installation costs

On top of the charger. A certified electrician should install it on its own circuit with an earth-leakage breaker and proper earthing.

Single phase, 7 kW (typical house)

Cable, 4–6 mm² (about 20 m)Rs 4,000 – 7,000
Breaker (MCB) + earth-leakage breaker (RCCB)Rs 3,500 – 5,500
Surge + voltage protectorRs 4,500 – 7,500
Earthing rod + small DB boxRs 3,000 – 4,000
Electrician labourRs 3,000 – 8,000
Single phase installation Rs 18,000 – 50,000 Three phase installation (11 / 22 kW) Rs 30,000 – 60,000

Longer cable runs cost more. A new three-phase connection or higher sanctioned load is a separate application to your electricity company, with its own fees.

Which charger for your car?

Pick your car and charger to see how long a full charge takes and what home charging costs each month.

Full charge (10–100%)–
Units per month–
Home charging cost per month–
Petrol car, same distance–
You save per month–
Charger + installation pays back in–

Petrol car: 12 km per litre at Rs 330 per litre. Payback uses a typical charger + installation cost for the size you picked.

Before you install

Three things most Pakistani homes should check first.

1. Check your sanctioned load

Look at your electricity bill for Sanctioned Load. Many houses are 3–5 kW. A 7 kW charger plus AC and other appliances can trip your main breaker. If it is under about 7–10 kW, apply to your electricity company (K-Electric, LESCO, IESCO, FESCO …) to increase it, or set the charger to a lower current.

2. Plan for voltage and load shedding

Fit a voltage protector (high/low cut-off) on the charger circuit. Choose a charger that restarts by itself after a power cut, and use scheduled charging late at night when the load on the line is lower. Never charge through a UPS or home inverter battery.

3. Get these ready for the installer

  • Distance from your DB (breaker box) to the parking spot
  • Covered porch or open parking (outdoor needs weatherproof IP54+)
  • Single or three phase meter
  • A photo of your DB and meter
  • Your car's model and plug type

Safety checklist

  • Its own circuit and breaker, not shared with AC, geyser or motor
  • Earth-leakage breaker (RCCB, 30 mA) and proper earthing, tested
  • Correct cable size for the charger (usually 6 mm² for 7 kW) and a short run
  • No extension leads, multi-plugs or adaptors on a normal socket
  • Weatherproof socket or wall box if it is outdoors
  • Installed by a licensed electrician, with a written quote and warranty

Public charging stations by city

For longer trips, or while your home charger is being installed.

EV charger installers

Companies that install home chargers, heavy-duty sockets and solar charging. Contact them directly for a quote.

K

Kinetic

All Pakistan · 20 years experience

Wallbox installHeavy-duty socketSolar integrationCommercial sitesMaintenance

Chargers / brands: CITA / Evee

K

KRF Electric

Faisalabad, Lahore · 15 years experience

Wallbox installHeavy-duty socketSolar integrationCommercial sitesMaintenance
G

Greenvik Engineering

Lahore, Islamabad · 10 years experience

Wallbox installHeavy-duty socketSolar integrationMaintenance
P

Paramount Voltics

Lahore · 10 years experience

Wallbox installHeavy-duty socketSolar integrationCommercial sitesMaintenance

Chargers / brands: CITA, BYD, Audi

T

The Experts Solar

Islamabad, Rawalpindi · 6 years experience

Wallbox installHeavy-duty socketSolar integration

Chargers / brands: BYD, Deepal

E

EV Wheels (Private) Limited

Islamabad, Rawalpindi, Karachi · 1 year experience

Wallbox installHeavy-duty socketSolar integrationCommercial sitesMaintenance
See all 10 installers by city →

Do you install or sell EV chargers?

List your company free on EVFinder.pk and get calls from EV owners in your city.

List your company free

Charge from your solar panels

If you have a hybrid or on-grid solar system, charging in the daytime can cover a large part of your car's electricity. A 7 kW charger needs about 7 kW of spare solar power to run fully on sunshine; with less, it takes the rest from the grid.

See how much of your EV your panels can charge: Solar Charging Calculator →

Questions people ask

How much does a home EV charger cost in Pakistan?

A 7 kW wall box costs about Rs 95,000 to Rs 2,45,000, and installation adds roughly Rs 18,000 to Rs 50,000. Faster 11 kW and 22 kW three-phase chargers cost about Rs 1,85,000 to Rs 3,20,000 plus installation.

Do I need a three-phase connection?

No. A 7 kW charger works on a normal single-phase house connection and fully charges most cars overnight. Three phase is only needed for 11 kW or 22 kW chargers, and only helps if your car accepts that much AC power.

Can I charge from a normal socket?

Yes, with the portable charger that comes with most cars, on a heavy-duty 15 A socket with proper earthing. It is slow (about 15–18 hours for a full charge) and the wiring must be checked by an electrician first.

Which plug do cars in Pakistan use?

Most new cars sold in Pakistan use Type 2 for AC charging and CCS2 for DC fast charging. Some Chinese imports use GB/T. Check your car before buying a charger; adapters are available.

How much does it cost to charge at home?

At about Rs 60 per unit, a car that uses 15 units per 100 km costs around Rs 900 per 100 km. Use the calculator above for your own car and daily distance.

My sanctioned load is 5 kW. Can I install a 7 kW charger?

It may trip your main breaker when the AC or other heavy appliances are on. Either apply to your electricity company to increase the sanctioned load, or ask the installer to set the charger to a lower current (for example 16 A, about 3.7 kW) until the load is increased.

Is a normal socket enough, or do I need a wall box?

If you drive under about 40–50 km a day, a heavy-duty 15 A socket on its own circuit, with the portable charger that comes with the car, can usually refill it overnight. For longer daily driving or a big battery, a 7 kW wall box is worth it.

Can I charge my EV from solar or a UPS?

From solar panels, yes: charging in the daytime from a hybrid inverter can cover a large part of the cost. A home UPS is too small to charge a car and can be damaged, so do not use it.

Does the electricity company charge extra for an EV charger?

Normal home charging is billed on your regular meter at your normal tariff. A new three-phase connection or a higher sanctioned load needs an application to your electricity company (K-Electric, LESCO, IESCO, FESCO, etc.), which has its own fees.